Scenario Processing

Scenario Processing

Scenario Processing

After adding at least one DER, the scenario will be valid to save. Once saved, the scenario can be submitted for processing.

NOTE: once a scenario is submitted, it cannot be modified; however, a submitted scenario can be copied and the copy modified and submitted.

During processing, Keystone Designer determines the optimal combination of equipment to maximize the benefit of the proposed microgrid, balancing between the initial capital investment and the project savings over the 20-year lifetime. During this analysis, Keystone Designer considers a multi-year analysis of all equipment selected as optimal, including:

  • Equipment degradation, year over year
  • Battery and inverter replacement costs and timing
  • Operations and maintenance costs and related escalation
  • Utility rate escalations
  • Storage equipment warrantied throughput and term
  • Equipment constraints, such as available area for PV installation and desired number of storage units
  • Advanced settings for PV generation, like system losses and inverter efficiency.

Inputs for all of these are available within the advanced settings areas both at the scenario and equipment levels. Some of these settings are read-only as they are specified by the equipment manufacturer, but other settings, though set to defaults that reflect Fortress Power's experience in the industry, can be customized per optimization run.

NOTE: because of the advanced analysis required, scenarios can take 30 minutes or more to process. Once a scenario has been processed, an email with a link to the results is sent to the user who submitted the scenario for processing.


    • Related Articles

    • Scenario List and Actions

      Scenario List and Actions Within the scenario list at the project level, several options are available. Clicking Compare opens a page that shows high-level equipment and financial metrics for all processed scenarios in that project. To filter the ...
    • Simple Controls Scenarios

      Simple Controls Scenarios Starting in May 2025, Keystone Designer supports the modeling of Simple Controls scenarios. In this context, Simple Controls means charging an energy storage system during off-peak times, and discharging the system during ...
    • Additional Scenario Features

      Additional Scenario Features After running an initial optimization scenario as a starting point, it is common for users to want to refine the scenario parameters and compare these refined results. Keystone Designer offers a few features that will ...
    • Overall Scenario Settings

      Overall Scenario Settings An optimization scenario, centered around a single energy use profile, defines the settings, resources, and constraints to be considered when designing the optimal installed microgrid. Scenarios are built with smart defaults ...
    • Creating and Running Your First Keystone Designer Scenario

      You can run your first Keystone Designer scenario in ten easy steps. 1. Log into Keystone Designer: https://mvso.fortresspower.io 2. Create a new project: 3. The new project wizard will step you through all the project-level required fields, ...